Upper Warlingham Footbridge

Upper Warlingham Footbridge

Transforming Upper Warlingham: Full Footbridge Refurbishment with Expert Corrosion Protection

Project Overview

The Upper Warlingham Station Footbridge, an essential part of the local rail infrastructure, underwent a complete refurbishment to restore its structure, enhance its longevity, and meet modern Network Rail standards.

SPG were engaged by Beaver Bridges and principal contractor VolkerFitzpatrick to deliver end-to-end steel surface preparation and corrosion protection, critical to the successful revitalisation of this historic bridge.

Upper Warlingham Footbridge - Scaffolding surrounding the bridge structure
Upper Warlingham Footbridge - Close-up of blasting and surface work

Scope of Work

SPG provided critical services focused on preparing and protecting the footbridge’s structural steelwork. Our scope included:

  • Mechanical surface preparation of all steel components

  • Application of a durable protective coating system suited for rail infrastructure

  • On-site delivery under strict safety and operational controls

  • Full compliance with Network Rail coating specifications

Challenges & Expertise

Working within a live rail environment required careful planning, temporary protective systems, and phased operations. Our team ensured all processes, from surface stripping to protective coating, were carried out safely, efficiently, and with minimal disruption to commuters.

SPG’s attention to detail and technical capability meant the footbridge was refurbished to the highest quality, capable of withstanding the elements and usage demands for decades to come.

Upper Warlingham Footbridge midway
Upper Warlinham Footbridge in progress
Upper Warlingham Footbridge workers
Upper Warlingham Footbridge the bridge mid-way through refurbishment

Results

The transformed Upper Warlingham Footbridge now features:

  • Structurally sound, fully protected steelwork

  • A durable, professional finish across all components

  • Improved safety and enhanced user experience

  • Long-term resistance to environmental and operational wear

Services Delivered

  • Steel Surface Preparation

  • Mechanical Cleaning Techniques

  • Corrosion Protection Systems

  • Application of Protective Coatings

  • Rail-Compliant Project Delivery

Upper Warlingham Footbridge before
Upper Warlingham Footbridge after

The successful refurbishment of the Upper Warlingham Footbridge is a testament to SPG’s expertise in steel surface preparation and corrosion protection for critical infrastructure. Working collaboratively with Beaver Bridges, VolkerFitzpatrick, and Network Rail, we delivered a high-quality finish that ensures structural integrity, long-term performance, and enhanced user safety.